Golden Fred
We capture installation evidence at the point of work, link it directly to the project's Golden Thread, and produce an audit-ready handover pack in seconds. The platform replaces the spreadsheets, dropboxes, and disconnected job sheets that fail under BSR scrutiny on Higher-Risk Buildings.
Golden Fred was built in the field, alongside a working passive fire protection install team and shaped by a 20-year UK Fire and Rescue Service operational veteran. One platform for job management, CRM, evidence capture, materials tracking, and full compliance reporting. Web and mobile.
At SHW Live London we launch the full platform to the UK fire safety community, including Golden Fred Field, our new iPad and iPhone app for engineers and installers, plus a stand preview of Ask Fred AI, our forthcoming compliance assistant.
Visit stand F72 to watch a Building Safety Act handover pack produced live in 60 seconds. Bring your toughest compliance scenario, a real project, or your worst Golden Thread headache, and we will run it through the platform in front of you.
Founding Customer Programme rates close 31 July 2026.
Address
71-75 Shelton StreetCovent Garden
London
WC2H 9JQ
United Kingdom
)